航网

资讯

国外港口PSC检查的重点和趋势(二)——巴黎备忘录地区


自疫病发生近一年来,要为有效降低疫病外扩散高风险,保护好海员、集装箱码头国检杳官和别相关工作人员的私人的安全,一起最明显化的长期保持船舶制造正常的运营服务,香蕉视频海事处团队和其它备忘各地相继发表需要对方法。随后,日本京都备忘于202半年6月1日发表了需要对Covid-19的被临时要点;从202半年8月1日起开启远距离PSC检杳等,这类方法一直的影响着集装箱码头国质量监督检杳的推进。           今天,KR船级社数据统计分析了今年时间内首要年度、半年度在线视频免费网站黄查询国质量监查捡查现状,它彰显了各国家/城市在线视频免费网站黄查询国质量监查捡查的省级突出和大趋势。那末对於莫斯科备忘城市,上1个年度、半年度PSC捡查的现状怎么样去?未来发展捡查的省级突出会是甚么?

01Detainable deficiencies

202在一年第一次第三季度,法国巴黎记事本位置不管是是飞机限制出境艘次,更是限制出境率都严重提升,促使限制出境常见问题如表: (1)FIRE SAETY Fire Dampers of E/R supplier fans not workings & duct distortion Emergency fire pump found inoperative during test A-class fire door in galley fixed to open Water mist system defective Some fire doors defective and not closed completely Several self-closing valves for sounding pipes and for level indicators blocked in open position Oil leakage from main engine oil cooler through damaged gaskets Main fire line on main deck inoperative (frozen) Full of oil mixture in engine room bilge well (2)ISM ISM detainable deficiency on the basis of many deficiencies Crew unfamiliar with operation of machinery and position of equipment on board Crew not familiar with RADAR operation and emergency steering Inappropriate implementation of enclosed space procedures SMS implementation failure No records of lifeboat operation (3)MLC(Working and Living Condition) Accommodation heating systems Toilets flushing system in the accommodation not working correctly Accommodation not in cleanliness All crew members' wages not paid in full and at monthly intervals Total lack of fresh vegetables and fruit. SEA expired, over maximum period of shipboard service for seafarers (4)Life Saving Appliances Lifeboat Engine not starting Lifeboats not lowered and maneuvered into the water Rescue boat and life raft defective Rescue boat launching davit hydraulic leaks and pressure gauge inoperative (5)Pollution Prevention Sewage treatment plant not working properly Deck full of oil pollution hazards Insufficient procedure for changeover when entering SECA Eng. Room Bilge High water level alarm inoperative Oily Water Separator inoperative and found some leakage Full of Residual tank & bilge collecting tank (6)ILL Side shell crack Manhole from engine room to bilge keel space in open Hatch coaming bracket crack Natural ventilator (mushroom type) holed and patched temporally, Gooseneck air vent closing devices missing Hatch cover cleat missing (7)Certificate and Documentation Civil liability for bunker oil pollution damage certification is not valid (Only photocopy)   Flag endorsement missing for 2/O, 3/O and C/E Medical certificate expired Captain not holding GOC No SMC on board (8)Safety of Navigation Several navigation lights damaged and inoperative ECDIS not in use up to date MF/HF and VHF DSC not operational No charts and nautical publications available Bridge found one window of different thickness

02Items to be inspected thoroughly

在伦敦记事本地方,PSCO会对以內项目流程进行进一步的诊断,以查证是否有具备想关标准要求 (1)FIRE SAETY Operation of em’cy fire pump and leak check Function and contact condition of E/R funnel damper Condition of Fireman’s outfit Closing condition of A-class fire door Fire doors in normal operation Installation of insulation for heat surface Enough ventilation of cargo holds before entering a port Check operation of water mist system Check of breathing apparatus and its attachment Self-closing valves for sounding pipes and for level indicators Operation and maintenance of main engine oil cooler Sprinkler nozzles in normal working condition without blockage of deposits in the nozzles (2)ISM Implementation of Fire and Abandon ship Drill and record Black out test (simulation test) and crews’ familiarity with it Crews’ familiarity with the operation of CO2 system PSCO emphasizes implementation of ISM and checks real-time NIR database Drill records for emergency response SMS on board properly implemented Crew familiarization with machinery and position of equipment on board Correspondence and familiarization of SOLAS training manual and equipment on board Check effectiveness of emergency drills and familiarity related to responsible equipment and system Crew familiarization with lifeboat operation Compliance of procedures for enclosed space entry Check compliance of COLREG of duty officers (3)MLC(Working and Living Condition) Crews protection  Crew’s including captain and C/E working hour and resting hour record Toilet operation in accommodation Accommodation cleanness Wages paid regularly and in full accordance with SEA (4)Life Saving Appliances Immediate start of em’cy equipment under very cold weather Magnetic compass in lifeboat Hydraulic system in launching appliance for rescue boat Condition of rescue boat and liferaft Navigation and radio equipment in good working condition for immediate use EEBDs with sufficient air pressure and good working condition (5)Pollution Prevention Operation of sewage treatment plant Inspection related to SOx emission Operation of quick closing valve Control of garbage Procedures for fuel changeover when entering SECA Function of oily water separator and 15ppm alarm check  High water level alarm Hatch cover hydraulic cylinder in good working condition OWS in proper working condition (6)ILL Condition of structure Function of water ingress system and de-watering system Manhole properly secured, closed (7)Safety of Navigation VDR function and random alarm test and normal condition check after reset Navigation plan and up-to-date notice to mariner, chart and publication Function of GMDSS and familiarity with GMDSS equipment Check condition of navigation lights Check ECDIS/ENC in use up to date
源于: 沙滩安全检查

友情链接

联系我们

固定电话:025-85511250 / 85511260 / 85511275 接转传真:025-85567816 电子邮箱:89655699@qq.com
技术支持:
  在线视频免费网站黄 版权所有